Converting system to a Worcester-Bosch CDI combi boiler in Crystal Palace SE19

Converting a conventional system to a sealed system with a Worcester-Bosch CDI combination boiler. As you can see the sludge magnetized to the Magnaclean power flushing filter. Power flushing this system was essential as the sludge would have caused major problems in the future if left in the system. A Spirotech Magnabooster central heating filter was installed on the return pipe to the boiler to protect it from future iron oxide deposits.

This entry was posted in Installation Blog. Bookmark the permalink.